"CONDOR" Facility
ERC Midstream is planning a new 60 MMCFD "Condor" Processing and Fractionation Facility in the DJ Basin southeast of the city of Loveland in Larimer county in northern Colorado. ERC will also construct and operate a radial gas gathering pipeline system to accumulate wellhead gas from local producers. Estimated online 4th quarter 2019.
Cryogenic Processing:
The Condor Facility will provide 60 MMCFD of cryogenic processing for wellhead natural gas.Fractionation:
The Condor Facility will include fractionation to produceCompressed Natural Gas (CNG)
The Condor Facility will provide 20 MMCFD of CNG (3,600 psig).Gas Gathering Pipeline:
The “South Lateral” will be an East-West rich gas gathering trunk-line located parallel to County Road 14 connecting west to County Road 7 and east to County Road 17, the “North Lateral” will be an East-West gathering pipeline parallel to County Road 16, and the “Main Lateral” will connect the system running north and south by running parallel to Colorado Blvd. The gas gathering system will operate at 200 psig and will gather and bring rich gas to the Condor Facility.